Campus maps show the facilities planning and construction project sites for 2017. The intent of the general map is to identify the locations and dates that will be affected, as well as identify the project.

As always, some projects will affect pedestrian and vehicular movements more than others. Those projects will be supplemented with additional phasing and traffic plans.

As projects progress, larger more detailed maps will be provided as needed to communicate details in advance of the changes. The two projects with the most impact on pedestrian and vehicular movements are the new residence hall and bookstore, and the Centennial Hall steam and condensate line replacement.

Spring Campus Projects

During this spring, you can expect to see:

  • Continued construction of the new 162,000 square foot; 7-story residence building
  • Construction of a district chiller plant, located west of the existing electrical substitution; construction will impact Osuna Drive and the road/parking spaces between Columbia and Navy Halls during the period of May 15, 2017- June 30, 2017
  • Installation of new steam lines and vaults as well as the replacement of sidewalks, curbs, and light poles to the east of Centennial Hall; beginning May 2017 through August 2017, walkways and bus stops in the area will be unavailable due to construction
  • Construction of a pedestrian overpass across Lightstreet Road, connecting the student housing complexes on Honeysuckle Lane with the lower campus at the rear of Haas Center
  • Updates to Kuster Auditorium in Hartline Science Center including new lighting systems, carpeting and seat cushions
  • Updated finishes in the faculty office areas in the southwest corner of McCormick Center including new carpet and wall bases in corridors and common spaces as well as new lighting fixtures in private offices
  • Painting of interior doors and frames in Montour Residence Hall
  • Installation of new electrical switches in E&G buildings including Old Science, Ben Franklin, Haas Center, McCormick, Sutliff Hall, Hartline Science Center, Andruss Library, Centennial Hall, Student Rec. Center, Navy Hall
  • New surface coatings on all parking decks of the Tri-Level Parking Garage
  • Kitchen steam pipe replacement in Scranton Commons
  • Installation of a new fan exhaust/hood in the fabric studio room 311 on the third floor of Old Science Hall
  • Replacement of existing coal fired boilers with natural gas fired boilers as well as updating existing electrical and telecommunication systems in BU’s heating plant
  • Re-coat the infield of the running track in Redman Stadium
  • New vinyl flooring in the first and second floor common areas in 8 buildings of Mount Olympus Apartments on Upper Campus
  • Renovation to Monty's dining area; Monty's will be closed during the construction period of May 15, 2017-August 18, 2017
  • Rejuvenated parking lots of Montgomery Place Apartments; MPA parking lots will be closed starting May 15, 2017 through August 2017
  • Repairs to the existing wall on the north side of the gymnasium in Nelson Field House